Skip to content
Merthyr Tydfil Counts — Merthyr Tydfil, in numbers.Local help →

Merthyr Tydfil, in numbers

Projects

Merthyr Tydfil council area. Every figure carries its own date.

The local plans, investments and decisions worth following.

3 selected records checked against official sources. A plan is not a completed project; each record shows the stage its source establishes.

Aberfan

Aberfan synthetic sports pitch

A renewed sports facility is available to local clubs and residents.

Officially opened in February 2026 · evidence dated 2026-02-05

Responsible body: Merthyr Tydfil County Borough Council

What the source says: The 5 February announcement confirms opening. Other school-pitch works mentioned in the same release are not automatically treated as complete.

Next thing to establish: What is the approved cost, including ongoing maintenance?

Progress, funding and source
Cost
Not established by the evidence checked.
Funding
Not established by the evidence checked.
Area covered
Named project location only. No verified current ward impact footprint; no ward-wide effect is inferred.

No verified ward footprint is assigned.

Aberfan sports facility opens →

Source checked 2026-10-17. A plan or announcement is not proof of completion.

Questions for the next progress report

  • Which funding is committed, and what remains conditional?
  • Which neighbourhoods are covered by an official project plan, and which benefits still need testing?
  • What is the next published milestone, and what evidence will show residents benefit?

The Aberfan facility has a verified opening →

Target support where disadvantages overlap →

How to track delivery →

Merthyr Tydfil

Cyfarthfa Castle roof and drainage repairs

Repairs protect the historic building while the park and museum continue operating.

Essential works progressing in July 2026 · evidence dated 2026-07-09

Responsible body: Merthyr Tydfil County Borough Council

What the source says: The July update expects drainage works over the following months and roof completion in 2027. A separate wider redevelopment funding bid was not taken forward.

Next thing to establish: What is the approved cost, including ongoing maintenance?

Progress, funding and source
Cost
Not established by the evidence checked.
Funding
Not established by the evidence checked.
Area covered
Named project location only. No verified current ward impact footprint; no ward-wide effect is inferred.

No verified ward footprint is assigned.

Cyfarthfa Castle and Park works →

Source checked 2026-10-17. A plan or announcement is not proof of completion.

Questions for the next progress report

  • Which funding is committed, and what remains conditional?
  • Which neighbourhoods are covered by an official project plan, and which benefits still need testing?
  • What is the next published milestone, and what evidence will show residents benefit?

The castle still has essential repair needs →

The wider castle vision still needs funding →

Target support where disadvantages overlap →

How to track delivery →

Treharris

Treharris Nursery Centre energy upgrades

The building has more efficient lighting, solar power and better heating control.

Lighting, solar panels and boiler-control upgrades installed · source does not state a status date

Responsible body: Merthyr Tydfil County Borough Council

What the source says: The council reports installed equipment, including a 15-kilowatt solar system. Its reported energy saving is not used as a verified borough-wide reduction.

Next thing to establish: What dated decision or progress report confirms the current stage?

Progress, funding and source
Cost
Not established by the evidence checked.
Funding
Not established by the evidence checked.
Area covered
Named project location only. No verified current ward impact footprint; no ward-wide effect is inferred.

No verified ward footprint is assigned.

Energy upgrades in schools and libraries →

Source checked 2026-10-17. A plan or announcement is not proof of completion.

Questions for the next progress report

  • What is the approved cost, including ongoing maintenance?
  • Which funding is committed, and what remains conditional?
  • Which neighbourhoods are covered by an official project plan, and which benefits still need testing?
  • What is the next published milestone, and what evidence will show residents benefit?

Measure the benefit of everyday energy upgrades →

Target support where disadvantages overlap →

How to track delivery →